MAJOR PROJECT RAIL

Gippsland Line Upgrade
  • Signalling – UGL Pty Limited
  • Railway Stations Light and Power– Kelly Electrical
Frankston Line Level Crossing Removal
  • Signalling: Active Railway Signalling
  • HV Cable Installations: RSGX
  • Overheads: Category 5
  • Railway Stations Light and Power: Q4
Kananook Train Depot and Maintenance Facility
  • Signalling: Active Railway Signalling
  • Overheads: Category 5
  • Substation: John Holland
  • Light and Power: ODM Infrastructure
Melton Line Upgrade

Signalling: John Holland Group

Maidstone Tram Depot and Stabling Facility
  • Light and Power: ODM Infrastructure and Lowes Electrical Contractors
  • Substation: John Holland
  • Overheads: John Holland
  • Signals: TBC
South Geelong to Waurn Ponds Duplication Project
  • Signalling: Downer DTI
  • Railway Stations: Kelly Electrical
Somerton Inter-modal Rail Transport Hub
  • LV Light and Power: Q4
  • HV and Substations: Nielsen
  • Signalling: TBC
In-Land Rail Beveridge to Albury

Railway Signalling: John Holland